• About us
Log inDemo

Quality

Spot quality issues. Follow through on the fix.

A shared record of checks and quality issues

Each quality issue is linked to a product, lot or supplier, with measurements and affected quantities. Investigation, correction and closure remain part of the same record. Assign the necessary actions so the team knows what happens next.

Request a demo

Follow an issue from detection to correction

The defect record shows affected goods, containment decisions and corrective actions. Each assigned action has a responsible person and a completion date.

Request a demo

Lot decisions

Record whether affected goods are held, released, reworked or rejected after review.

Containment

Track where affected goods are moved while the team investigates the issue.

Inspection results

Measured values and specifications appear together with the recorded inspection result.

Corrective actions

Assign a specific correction with an owner and a clear completion date.

Make open quality issues easy to follow

Findings, deadlines and evidence remain available across the lots and products your team manages. Open issues and missing certificates make unfinished work visible.

Request a demo

Issue details

The defect, affected lot, findings and next actions share one quality record.

Issues by lot

Check which problems are resolved and which still require action for each lot.

Action deadlines

See upcoming deadlines and the people responsible for resolving outstanding quality issues.

Follow-up checks

Record additional inspections and the time spent verifying that a correction worked.

Missing certificates

Track required supplier documents and follow up before closing the quality issue.

Quality software that follows your inspection methods.

In a 30-minute demo, review your inspections, nonconformities and corrective actions, then see how to organize your quality follow-up in Eno.

Request a demo

How teams use it

Examples of how this can fit into daily work.

“When a seal fails inspection, we keep the measurements, held quantities and corrective action together. The next shift can see exactly what still needs checking before release.”

QM
Quality manager
Food packaging plant

“We can trace an assembly defect to the lot and record the follow-up test. Production and quality review the same information instead of comparing separate reports.”

PL
Production lead
Electronics assembler
Connected information
Keep the details and follow-up work in the same workspace.
Request a demo
ProductionFollow manufacturing orders, component requirements, progress and actual production costs.ExploreInventoryTrack stock quantities, locations, reservations and availability.ExplorePurchasingManage purchase requests, supplier orders, receipts and payment terms.Explore

Questions and answers

The product or lot, defect, measurements, affected quantity, supporting documents and corrective actions. Adapt the fields to your checks and quality procedures.

Quality software that follows your inspection methods.

In a 30-minute demo, review your inspections, nonconformities and corrective actions, then see how to organize your quality follow-up in Eno.

Request a demo

Platform

  • Data Model
  • AI
  • Analytics
  • Integrations
  • Workflows
  • Documents
  • Collaboration
  • Knowledge
  • Security & Access

Modules

  • Platform
  • Site
  • Sales
  • Finance
  • Supply Chain
  • People
  • Marketing
  • Services
  • Discover all modules

Industries

  • Catering
  • Construction Company
  • Private Equity
  • Law Office
  • Real Estate Agency
  • Fitness Center
  • Media Production Studio
  • Recruitment Agency
  • All industries

Resources

  • Updates
  • Changelog
  • Switch to Eno
  • Download
  • Contact

Legal

  • Privacy
  • Terms
  • Subprocessors

Company

  • About us
  • Careers
  • Press & Brand
  • Manifesto
  • Design partners
  • Ambassador program
  • Industry co-founders

Compare

  • Lovable

© 2025 Eno. All rights reserved.

  • LinkedIn
  • X
  • GitHub
  1. Quality
  2. /
  3. Quality issues

Quality issues

Reported3
QN-0251
LF

Minor
QN-0252
TV

Minor
QN-0253
NB

Major
Investigating3
QN-0248
CR

Major
QN-0246
TV

Major
QN-0247
LF

Critical
Correcting2
QN-0241
NB

Major
QN-0243
CR

Minor
Verification2
QN-0237
LF

Major
QN-0239
TV

Minor
Closed2
QN-0230
CR

Minor
QN-0232
NB

Minor
Investigating
CRCamille Roux
Major
Pouch 250 g
PK-260912
17 Sept 2026

Comments

  1. Léa Fontaine15 Sept, 07:10

    Held 240 bags from lot PK-260912. Seal width measured 4.1 mm against the 5.0 mm work instruction.
  2. Camille Roux15 Sept, 07:35

    Checking the sealing jaw setup. Keep the lot on hold until the repeat sample is reviewed.
PK-260912
Pouch 250 g · Seal width below specification
On hold
240
bags held

Inspection

4.1 mm seal width
Accepted from 5.0 to 5.5 mm
3 mm6 mm
Work instruction
Seal width 5.0 mm
Camille RouxQuarantine rack
Containment
Held

Pouch 250 g

PK-260912 · 240 bags

  1. P2

    Released

    Packing line 2

  2. QR

    Holding

    Quarantine rack

15 September08:40
Seal width
Pouch 250 g · PK-260912
Upper limitTargetLower limitOut of limits
  • 07:00: 5.3
  • 07:30: 5.2
  • 08:00: 5.3
  • 08:15: 5.1
  • 08:30: 4.1 Out of limits
Samples out of limits1 of 5
Replace worn alignment guide
QN-0241 · Corrective action
Correcting
Owner
Nicolas Bruel
Due
19 September
Severity
Major
Seal width below specification / QN-0248
Pouch 250 g · Lot PK-260912
InvestigatingMajor
Measured4.1 mm
Sample at 08:30
Work instruction5.0 mm
Sealing jaw setup
Quantity held240 bags
Quarantine rack
OwnerCamille Roux
Checking the jaw setup
Due date17 Sep
Issues by lot
Open and closed quality issues
Lot
Issues closed1/7
x

Pouch 250 g · PK-260912

closed: 0/4
  • Seal width below specification

    Investigating

  • Missing supplier certificate

    Reported

  • Replace worn alignment guide

    Correcting

  • Verify revised pack instruction

    Verification

Printed carton · CT-260910

closed: 1/3
  • Label roll alignment

    Closed

  • Wrong carton label

    Reported

  • Rework carton print setup

    Correcting

QN-0247
Mixed lot labels · HS-260908
Critical
3 days
Time left
Since reported3 days/6 days
x
Owner
QN-0237
Repeat pressure sample · HS-260908
Verification
1 h 15Logged
Pull 5 housings09:00 – 09:15
15 min
Pressure test09:15 – 09:55
40 min
Record the results09:55 – 10:15
20 min
Léa Fontaine3 entries
Supplier certificate
QN-0253 · PK-260912
Certificate requested on 13 September. 24 bags remain on hold until it arrives.

Next follow-up

20 September at 09:00

Repeat

Daily reminder selected.

© 2026 Eno. All rights reserved.

Log in
All systems normal