• About us
Log inDemo

PLM · Inventory and Manufacturing

Every product with its versions. One of them is what the shop floor builds.

This is the room.

One product, opened: its versions in the header, the bill of materials of the current one below, the drawing and the certificate on the version they belong to, and the change in progress reading in from the people reviewing it.

See it with your own products

The things a product record needs, none of them in a drive folder.

What a version carries, who reviews a change and which document goes out with it are yours to set.

See it on your own data

Versions of the bill of materials

Two versions open side by side, the lines that differ marked, the cost of each. The one marked current is the one every new manufacturing order reads.

Engineering change orders

A change is a record: what it affects, why, who reviews it, and the date it takes effect. Nothing on the shop floor moves until it is approved.

Drawings and certificates on the version

The drawing, the declaration of conformity and the test report sit on the version they describe, so v2's certificate never goes out with a v3 panel.

Where used

One part, every product and every open order that carries it, before you change it.

Every change, logged

Who changed which line, when, on which version, and the ECO that allowed it.

Your product, shaped for you. And for someone nothing like you.

What adapts: what a version is (a revision of one product, or a variant made for one client), the fields it carries, the documents attached to it, whether a change needs a change order and who reviews it. Two businesses can run PLM and disagree on every one of those.

See it on your own data

A bespoke furniture maker

A product is a piece, and a version is the variant made for one client: the finish, the width, the hardware, the client's approved drawing. A change asked by the client is a new variant on the same piece, signed off by the client, with no engineering change order in the way.

An electrical equipment maker

A product is a reference, and a version is a revision that every unit built after a date follows. It carries the declaration of conformity, the test report and the drawing per revision, and a change is an engineering change order reviewed by production, purchasing and quality before it takes effect.

The change takes effect on a date, everywhere at once.

ECO-2026-0009 is approved on 18 September and effective on 1 October. That date is a field on the change, and every record that carries the old driver reads it: v3 becomes the current version of the panel; the manufacturing orders launched before the date finish on v2, the ones planned after it are built on v3; the purchase order still open for 200 old drivers is flagged for purchasing to reduce or cancel; the 20 drivers left on the shelf after the last v2 order are shown as what they are, stock without a use, before anyone finds them in a count. The tool that only holds engineering settles all of that by email.

See it on your own data

The versions, the changes, the documents.

Versions

Every product with its current version, the one before and the one in draft, and the orders reading each.

The versions, the changes, the documents.

  1. Every product with its current version, the one before and the one in draft, and the orders reading each.

  2. Change orders by stage, from Draft to Effective, with the approvals still missing on each card.

  3. Every drawing, certificate and test report, by product and version, with the one out of date marked.

Reviewed together, on the record.

An engineering change is not engineering's alone. Production wants to know which orders finish on the old version; purchasing wants a price for the new part before it agrees; quality wants the test report attached. In Enobase all three review the same change order, comment on the line they care about, and approve on the record, so the change carries its own reasons and the approval is a field, not a thread in someone's mailbox.

See it on your own data

The version is what manufacturing builds.

A version is not a file that leaves for another system. The manufacturing order reads it, the purchase order reads its parts, the quality check reads its test plan, and the procedure reads its steps, because they are all records in the same workspace.

Book a demo

The manufacturing order reads the current version

A manufacturing order created after the effectivity date takes v3's components and v3's cost. The one launched before it keeps v2 to the end, and says so.

Purchase

Purchase

The new part on v3 needs a price and a supplier before the date. Purchasing asks, the quote lands on the part, and the first order for it is drafted.

Quality

Quality

The non-conformity that started the change closes on it, and the test plan for v3 is the one the next batch is checked against.

Knowledge

Knowledge

The assembly procedure is a page linked to the version, revised with it, so the shop floor reads v3's steps on the day v3 is current.

The drawing as a document

The drawing as a document

The drawing and the declaration of conformity are documents on the version, generated from its fields, signed, and sent with the batch.

Every order says which version it built.

A version is not a file that leaves for another system. The manufacturing order reads it, the purchase order reads its parts, the quality check reads its test plan, and the procedure reads its steps, because they are all records in the same workspace.

See Manufacturing

The PLM tool you would otherwise buy stops at the released revision.

It keeps the version, the bill of materials and the approved change clean. Then it pushes the revision to your ERP by connector, and the date, the price, the stock and the open orders are settled by hand on the other side.

  • Versions of the bill of materials, compared

    A spreadsheet
    A tab per version
    A PLM tool
    Yes
    A suite module
    Yes
    Enobase
    Yes, lines that differ marked, cost of each
  • A change order with approvals

    A spreadsheet
    By email
    A PLM tool
    Yes
    A suite module
    Yes
    Enobase
    Yes, reviewed by production, purchasing and quality on the record
  • Drawings and certificates on the version

    A spreadsheet
    In a folder
    A PLM tool
    Yes
    A suite module
    Yes
    Enobase
    Yes, as documents generated from the version
  • An effectivity date the orders read

    A spreadsheet
    No
    A PLM tool
    No
    A suite module
    Sometimes
    Enobase
    Yes, a field every open record reads
  • The supplier's price on the new part

    A spreadsheet
    Typed in
    A PLM tool
    No, in the ERP
    A suite module
    Yes, in their purchasing
    Enobase
    Yes, quoted on the part before the date
  • The stock of the old part after the date

    A spreadsheet
    Counted later
    A PLM tool
    No, in the ERP
    A suite module
    Yes, in their inventory
    Enobase
    Yes, shown as stock without a use
  • The manufacturing orders open on the old version

    A spreadsheet
    No
    A PLM tool
    No, in the ERP
    A suite module
    Yes, in their MRP
    Enobase
    Yes, each one says which version it builds
  • Time to live

    A spreadsheet
    A day
    A PLM tool
    Weeks, plus the connector
    A suite module
    Months
    Enobase
    One to two weeks
What you needA spreadsheetA PLM toolA suite moduleEnobase
Versions of the bill of materials, comparedA tab per versionYesYesYes, lines that differ marked, cost of each
A change order with approvalsBy emailYesYesYes, reviewed by production, purchasing and quality on the record
Drawings and certificates on the versionIn a folderYesYesYes, as documents generated from the version
An effectivity date the orders readNoNoSometimesYes, a field every open record reads
The supplier's price on the new partTyped inNo, in the ERPYes, in their purchasingYes, quoted on the part before the date
The stock of the old part after the dateCounted laterNo, in the ERPYes, in their inventoryYes, shown as stock without a use
The manufacturing orders open on the old versionNoNo, in the ERPYes, in their MRPYes, each one says which version it builds
Time to liveA dayWeeks, plus the connectorMonthsOne to two weeks

Questions about PLM

Yes. On its own it is the product record with its versions, its documents and its change orders, reviewed and approved. Turn Manufacturing on and the orders read the version; turn Purchase on and the new part gets its price and its order.

ManufacturingThe manufacturing order that builds the current version, and says which one it built.ExplorePurchaseThe price on the new part, and the open order on the old one, before the date.ExploreQualityThe non-conformity that starts the change, and the test plan the new version is checked against.Explore

See Enobase on your own products.

Book a demoGet access
Solutions
  • Finance
  • Quotes
  • E-Invoicing
  • HR & Payroll
Industries
  • Catering
  • Construction Company
  • Private Equity
  • All industries
Platform
  • Data Model
  • Knowledge & Collaboration
  • AI & Workflows
  • Analytics
  • Integrations
Company
  • About us
  • Hiring policy
  • Press & Brand
  • Download
  • Privacy
  • Terms
  • Subprocessors

© 2025 Enobase, Inc. All rights reserved.

  • LinkedIn
  • X
  • GitHub
marketing/screen-event-record
screen: marketing/screen-event-record family: screen view: record nav: Inbox, AI Assistant, Dashboards, Products, PLM (active), Manufacturing, Inventory, Purchase, Quality, Maintenance subject: a product record with its version bar, the current bill of materials and the pending change beside it content: ART-2104 LED panel 600x600 40 W; header: version v2 current, released 3 Feb 2026, cost €38.40, in stock 38, on order 60, owner Mathilde Renard; version bar v1, v2 (current), v3 (ECO-2026-0009, effective 1 Oct); tabs Bill of materials (active), Documents (4), Changes (1), Where used (2); BOM rows ART-2109 LED module 600x600 1 × €16.20 · ART-2117 Driver 40 W 1 × €9.60 · ART-2112 Aluminium frame 1 × €7.80 · ART-2113 Diffuser 1 × €3.10 · Fasteners 8 × €0.10 · Assembly 0.15 h €0.90; total €38.40; side panel: ECO-2026-0009 "Replace driver ART-2117 with dimmable ART-2140", 2 of 3 approvals, quality pending neighbour: screen-workspace-records · that one is a booking's record; this is a product with its versions across the top tags: modules=plm,manufacturing · categories=inventory-manufacturing · capabilities=documents,views · industries= · sections=full-screen,swipe · reusable=yes
Open asset editor
marketing/widget-invoice-issued
kind: record, frame: sticker; v2 and v3 of ART-2104 as two columns, ART-2117 struck through on the left, ART-2140 marked on the right, cost €38.40 against €40.20, "1 line changed, +€1.80"
Open asset editor
marketing/asset-status-roll
with "ECO-2026-0009, ART-2104" rolling from Draft to In review to Approved to Effective 1 Oct
Open asset editor
marketing/asset-document-preview
with "ART-2104 v3 drawing.pdf" and "CE declaration, ART-2104 v3, signed"
Open asset editor
marketing/asset-invoice-itemized
kind: record, frame: sticker; ART-2117 Driver 40 W used in ART-2104 v2, ART-2131 v2; open: MO-2026-0312, MO-2026-0315, PO-2026-0091; "3 open records affected"
Open asset editor
marketing/asset-activity-list
with "Mathilde Renard replaced ART-2117 with ART-2140 on v3", "Thomas Peeters approved for production", "Sofie Claes requested a price from Delaunay Group", "Karim Haddad attached test report LVD-0917"
Open asset editor
marketing/widget-experience-detail
widget: marketing/widget-experience-detail family: widget kind: record frame: sticker subject: one business's version of the unit of work, its own fields visible move: the fields that differ from the other case landing last, marked neighbour: widget-case-card · reused; the content is this case content: Furniture maker · ART-3040 Wall cabinet W120 · Variant: Maison Berger, oak, 1,180 mm, brass handles · Components: ART-2058 Birch plywood 18 mm, ART-2041 Oak veneer panel · Drawing: approved by Maison Berger, 4 Sep · Change: new variant, client sign-off · ECO: none · marked fields: Variant per client, Client sign-off, No ECO props: the business label, the object, the marked fields not: a filled operational record; this is the shape one business gave it static: yes
Open asset editor
marketing/widget-experience-detail
widget: marketing/widget-experience-detail family: widget kind: record frame: sticker subject: one business's version of the unit of work, its own fields visible move: the fields that differ from the other case landing last, marked neighbour: widget-case-card · reused; the content is this case content: Electrical equipment · ART-2104 LED panel 600x600 40 W · Revision: v3, effective 1 Oct 2026 · Documents: CE declaration v3, LVD test report LVD-0917, drawing v3 · Change: ECO-2026-0009, 3 approvals · Reviewers: production, purchasing, quality · marked fields: Effectivity date, Certificates per revision, Three approvals props: the business label, the object, the marked fields not: a filled operational record; this is the shape one business gave it static: yes
Open asset editor
marketing/asset-integrations-grid
widget: marketing/asset-integrations-grid family: widget kind: canvas frame: frameless subject: one approved change reaching, on its effectivity date, the version, the manufacturing orders, the open purchase order and the stock of the part it replaces move: the date landing on the change, then four lines leaving it one by one, each record updating as its line arrives neighbour: asset-change-propagation · that one is a guest count fanning out to documents and prep; this is an engineering change reaching four records in other modules, dated content: centre: ECO-2026-0009 "Replace ART-2117 with ART-2140", Approved 18 Sep, effective 1 Oct 2026. Lines to: ART-2104 v3 "current from 1 Oct, cost €40.20" · MO-2026-0312 60 units, started 22 Sep, "v2, unchanged" and MO-2026-0318 80 units, planned 3 Oct, "v3" · PO-2026-0091 Delaunay Group, 200 × ART-2117 at €9.60, expected 6 Oct, "flagged: after effectivity" · ART-2117 stock: 120 on hand, 100 reserved by v2 orders, "20 without a use after 1 Oct" props: the change, the date, the four records not: an approval flow; that is S7 static: no tags: modules=plm,manufacturing,purchase,inventory · categories=inventory-manufacturing · capabilities=automation · industries= · sections=zoom,split,band-dark · reusable=yes
Open asset editor
marketing/asset-activity-list
widget: marketing/asset-activity-list family: widget kind: record frame: sticker subject: one change order with its three reviewers, the comment each left on the line they own, and the approval landing last move: the comments arriving under their lines, then the last approval landing and the status chip turning to Approved neighbour: widget-review-two-views (appraisals page) · two people answering apart and read together; here three functions review one change and each approval is a field on it content: ECO-2026-0009 Replace driver ART-2117 with dimmable ART-2140 · raised by Mathilde Renard, 9 Sep, reason NC-2026-0021 flicker below 10% · Production, Thomas Peeters: "MO-2026-0312 finishes on v2, 0318 goes on v3" approved 15 Sep · Purchasing, Sofie Claes: "Delaunay Group quotes €11.40, 200 units" approved 17 Sep · Quality, Karim Haddad: "@Mathilde test report LVD-0917 attached" approved 18 Sep · effective 1 Oct 2026 · status Approved props: the change, the reviewers, the comment per line not: a chat static: no tags: modules=plm,quality,purchase · categories=inventory-manufacturing · capabilities=collaboration · industries= · sections=split,zoom,bento · reusable=yes
Open asset editor
marketing/widget-invoice-issued
widget: marketing/widget-invoice-issued family: widget kind: pair frame: sticker subject: the current version of a product and the manufacturing order that reads its components and cost move: the manufacturing order landing in front of the version, its component lines and cost filling from the version's bill of materials neighbour: widget-quote-to-project (project page) · that one is a document becoming a workspace; this is a version becoming an order to build content: behind: ART-2104 v3, current from 1 Oct 2026, 5 components, cost €40.20. In front: MO-2026-0318, 80 × ART-2104, planned 3 Oct, components 80 × ART-2109, 80 × ART-2140, 80 × ART-2112, 80 × ART-2113, 640 fasteners, cost €3,216.00, "built on v3" props: the version, the order, the quantity not: the change order; that is S5 static: no tags: modules=plm,manufacturing · categories=inventory-manufacturing · capabilities=automation · industries= · sections=bento,pair,split · reusable=yes
Open asset editor
marketing/widget-quotes-imported
with "ART-2140 Driver 40 W dimmable: Delaunay Group €11.40, 200 units, lead time 12 days, Accepted → PO-2026-0096 draft"
Open asset editor
marketing/asset-status-roll
with "NC-2026-0021 flicker below 10%, ART-2104" rolling from Open to ECO-2026-0009 raised to Closed on v3
Open asset editor
marketing/widget-contract-library
with "Assembly procedure ART-2104, page KB-2026-0071, revised for v3, reviewed by Thomas Peeters"
Open asset editor
marketing/asset-document-preview
with "CE declaration, ART-2104 v3, signed 17 Sep" and "ART-2104 v3 drawing.pdf"
Open asset editor

© 2026 Enobase, Inc. All rights reserved.

Log in
All systems normal