The lot quote
The survey, your prices and your rate per square metre prepare the quote for review.

Survey, statements, hours and retention connected to every lot.
What a lot needs is spread between the site, the van and the office.
Drag across the month. Every card stays where it is: only what it says about your lots changes.
Eight things a month on other people's sites asks of you today, and what each becomes with Enobase.
Progress per line from the survey, previous statements and retention already deducted.
Progress per line from the survey, previous statements and retention already deducted.
Statements, hours, prices and materials follow the same lots.
Each lot knows when its statement is due and what is left to survey.
Time on site lands on the lot, ready to approve on Monday.
Your material price, your rate per square metre, and the margin before you send.
What a lot needs is held against it, and a shortage says so before the crew leaves.
What each main contractor holds on your lots, and when it comes back.
The survey, your prices and your rate per square metre prepare the quote for review.
Statements due, retention releasable and quantities that moved, before you ask.
Compare how lots are followed from the site to the office.
Quantity survey per lot
Statement minus previous ones
Retention due per lot
Change orders signed on site
Site hours per lot
Materials reserved per lot
Questions to the main contractor
Custom fields
| What you need it to do | Spreadsheet and Word | A quote and invoice app | A generic ERP | Enobase |
|---|---|---|---|---|
| Quantity survey per lot | A sheet per lot | Not covered | A custom object | Covered |
| Statement minus previous ones | Deducted by hand | CoveredIts whole purpose | After a project | CoveredNative |
| Retention due per lot | Not covered | On the invoice only | Built by an integrator | Covered |
| Change orders signed on site | A message and a photo | Not covered | Once configured | Covered |
| Site hours per lot | Guessed on Friday | Not covered | CoveredOnce configured | Covered |
| Materials reserved per lot | Not covered | Not covered | CoveredOnce configured | Covered |
| Questions to the main contractor | A thread of messages | Not covered | Not covered | CoveredNative |
| Custom fields | CoveredAdd a column | Not covered | Not covered | Covered |
Prepare the change around the lots already running.
Your spreadsheets and surveys are the starting point for the lot records.
Start with the statements and the retention, then add hours and materials.
Agree the rollout between two statement dates.
Short answers. The long ones we would rather give you on a call.
The record starts with the lot: its survey, its statements and its retention. Quotes, hours and materials stay connected to it.

© 2026 Enobase, Inc. All rights reserved.