• About us
Log inDemo

Maintenance

Plan equipment maintenance and follow repairs

Maintenance history and planned work for every machine

Each machine or piece of equipment has a maintenance history with routine work and reported faults. Repair assignments include parts, time spent and operational impact, giving technicians the context they need for the intervention.

Book a demo

Keep maintenance work connected to equipment

Machine details, repair assignments and service intervals share the same equipment context. Recorded costs show how maintenance spending compares with the budget.

Book a demo

Equipment information

Find the machine’s details and maintenance context before planning the next intervention.

Repair assignments

Give each reported fault an owner, priority and target date for repair.

Service intervals

Operating hours and service thresholds show which machines are approaching scheduled maintenance.

Maintenance budgets

Follow recorded maintenance costs against the budget allocated to each machine.

Understand maintenance needs across the workshop

Costs, upcoming inspections and delayed interventions show maintenance needs across the workshop. Recorded updates explain what happened during previous work on each machine.

Book a demo

Maintenance cost breakdown

Parts, labour and other recorded costs explain the maintenance spending for your equipment.

Ask about equipment

Use the AI assistant to find and summarize information from equipment records.

Delayed work

Identify outstanding interventions and the equipment still waiting for maintenance or repairs.

Inspection deadlines

Keep upcoming inspection dates visible and assign the necessary preparation work.

Maintenance history

Review recorded updates to understand what happened during previous equipment interventions.

See how to organize your maintenance

Start with a machine, its service plan and a typical repair to explore your maintenance workflow.

Book a demo

How teams use it

Examples of how this can fit into daily work.

“When a press stops, we can find the previous repair and the parts used. The technician starts with useful history instead of asking everyone what happened last time.”

MM
Maintenance manager
Metal fabricator

“I can see which machines are due for service alongside the work already planned. It helps us arrange maintenance around furniture production rather than react to every breakdown.”

PM
Plant manager
Furniture maker
Connected information
Keep the details and follow-up work in the same workspace.
Book a demo
ProductionFollow manufacturing orders, component requirements, progress and actual production costs.ExploreFleetManage vehicles, driver assignments, bookings, maintenance and operating costs.ExploreField ServiceSchedule customer visits and track technicians, parts and completed work.Explore

Questions and answers

Yes. Recurring service work and interventions for faults or breakdowns can share the same equipment history. Your team can follow planned upkeep alongside repairs.

See how to organize your maintenance

Start with a machine, its service plan and a typical repair to explore your maintenance workflow.

Book a demo
Solutions
  • Finance
  • Quotes
  • E-Invoicing
  • HR & Payroll
Industries
  • Catering
  • Construction Company
  • Private Equity
  • All industries
Platform
  • Data Model
  • Knowledge & Collaboration
  • AI & Workflows
  • Analytics
  • Integrations
Company
  • About us
  • Hiring policy
  • Press & Brand
  • Download
  • Privacy
  • Terms
  • Subprocessors

© 2025 Enobase, Inc. All rights reserved.

  • LinkedIn
  • X
  • GitHub
    1. Downtime timeline
    EquipmentDowntime rate
    Hydraulic circuit
    Control cabinet
    Feed clamp
    Spindle
    Tool changer
    Back gauge
    Ram seals
    Optics
    Extraction
    Pressure vessel
    Air dryer
    Engine and drivetrain
    Jan 1
    00:0012:00
    Jan 2
    00:0012:00
    Jan 3
    00:0012:00
    Jan 4
    00:0012:00
    Jan 5
    00:0012:00
    Jan 6
    00:0012:00
    Jan 7
    00:0012:00
    Jan 8
    00:0012:00
    Jan 9
    00:0012:00
    Jan 10
    00:0012:00
    Jan 11
    00:0012:00
    Jan 12
    00:0012:00
    Jan 13
    00:0012:00
    Jan 14
    00:0012:00
    Jan 15
    00:0012:00
    Jan 16
    00:0012:00
    Jan 17
    00:0012:00
    Jan 18
    00:0012:00
    Jan 19
    00:0012:00
    Jan 20
    00:0012:00
    Jan 21
    00:0012:00
    Jan 22
    00:0012:00
    Jan 23
    00:0012:00
    Jan 24
    00:0012:00
    Jan 25
    00:0012:00
    Jan 26
    00:0012:00
    Jan 27
    00:0012:00
    Jan 28
    00:0012:00
    Jan 29
    00:0012:00
    Jan 30
    00:0012:00
    Jan 31
    00:0012:00
    Feb 1
    00:0012:00
    Feb 2
    00:0012:00
    Feb 3
    00:0012:00
    Feb 4
    00:0012:00
    Feb 5
    00:0012:00
    Feb 6
    00:0012:00
    Feb 7
    00:0012:00
    Feb 8
    00:0012:00
    Feb 9
    00:0012:00
    Feb 10
    00:0012:00
    Feb 11
    00:0012:00
    Feb 12
    00:0012:00
    Feb 13
    00:0012:00
    Feb 14
    00:0012:00
    Feb 15
    00:0012:00
    Feb 16
    00:0012:00
    Feb 17
    00:0012:00
    Feb 18
    00:0012:00
    Feb 19
    00:0012:00
    Feb 20
    00:0012:00
    Feb 21
    00:0012:00
    Feb 22
    00:0012:00
    Feb 23
    00:0012:00
    Feb 24
    00:0012:00
    Feb 25
    00:0012:00
    Feb 26
    00:0012:00
    Feb 27
    00:0012:00
    Feb 28
    00:0012:00
    Mar 1
    00:0012:00
    Mar 2
    00:0012:00
    Mar 3
    00:0012:00
    Mar 4
    00:0012:00
    Mar 5
    00:0012:00
    Mar 6
    00:0012:00
    Mar 7
    00:0012:00
    Mar 8
    00:0012:00
    Mar 9
    00:0012:00
    Mar 10
    00:0012:00
    Mar 11
    00:0012:00
    Mar 12
    00:0012:00
    Mar 13
    00:0012:00
    Mar 14
    00:0012:00
    Mar 15
    00:0012:00
    Mar 16
    00:0012:00
    Mar 17
    00:0012:00
    Mar 18
    00:0012:00
    Mar 19
    00:0012:00
    Mar 20
    00:0012:00
    Mar 21
    00:0012:00
    Mar 22
    00:0012:00
    Mar 23
    00:0012:00
    Mar 24
    00:0012:00
    Mar 25
    00:0012:00
    Mar 26
    00:0012:00
    Mar 27
    00:0012:00
    Mar 28
    00:0012:00
    Mar 29
    00:0012:00
    Mar 30
    00:0012:00
    Mar 31
    00:0012:00
    Apr 1
    00:0012:00
    Apr 2
    00:0012:00
    Apr 3
    00:0012:00
    Apr 4
    00:0012:00
    Apr 5
    00:0012:00
    Apr 6
    00:0012:00
    Apr 7
    00:0012:00
    Apr 8
    00:0012:00
    Apr 9
    00:0012:00
    Apr 10
    00:0012:00
    Apr 11
    00:0012:00
    Apr 12
    00:0012:00
    Apr 13
    00:0012:00
    Apr 14
    00:0012:00
    Apr 15
    00:0012:00
    Apr 16
    00:0012:00
    Apr 17
    00:0012:00
    Apr 18
    00:0012:00
    Apr 19
    00:0012:00
    Apr 20
    00:0012:00
    Apr 21
    00:0012:00
    Apr 22
    00:0012:00
    Apr 23
    00:0012:00
    Apr 24
    00:0012:00
    Apr 25
    00:0012:00
    Apr 26
    00:0012:00
    Apr 27
    00:0012:00
    Apr 28
    00:0012:00
    Apr 29
    00:0012:00
    Apr 30
    00:0012:00
    May 1
    00:0012:00
    May 2
    00:0012:00
    May 3
    00:0012:00
    May 4
    00:0012:00
    May 5
    00:0012:00
    May 6
    00:0012:00
    May 7
    00:0012:00
    May 8
    00:0012:00
    May 9
    00:0012:00
    May 10
    00:0012:00
    May 11
    00:0012:00
    May 12
    00:0012:00
    May 13
    00:0012:00
    May 14
    00:0012:00
    May 15
    00:0012:00
    May 16
    00:0012:00
    May 17
    00:0012:00
    May 18
    00:0012:00
    May 19
    00:0012:00
    May 20
    00:0012:00
    May 21
    00:0012:00
    May 22
    00:0012:00
    May 23
    00:0012:00
    May 24
    00:0012:00
    May 25
    00:0012:00
    May 26
    00:0012:00
    May 27
    00:0012:00
    May 28
    00:0012:00
    May 29
    00:0012:00
    May 30
    00:0012:00
    May 31
    00:0012:00
    Jun 1
    00:0012:00
    Jun 2
    00:0012:00
    Jun 3
    00:0012:00
    Jun 4
    00:0012:00
    Jun 5
    00:0012:00
    Jun 6
    00:0012:00
    Jun 7
    00:0012:00
    Jun 8
    00:0012:00
    Jun 9
    00:0012:00
    Jun 10
    00:0012:00
    Jun 11
    00:0012:00
    Jun 12
    00:0012:00
    Jun 13
    00:0012:00
    Jun 14
    00:0012:00
    Jun 15
    00:0012:00
    Jun 16
    00:0012:00
    Jun 17
    00:0012:00
    Jun 18
    00:0012:00
    Jun 19
    00:0012:00
    Jun 20
    00:0012:00
    Jun 21
    00:0012:00
    Jun 22
    00:0012:00
    Jun 23
    00:0012:00
    Jun 24
    00:0012:00
    Jun 25
    00:0012:00
    Jun 26
    00:0012:00
    Jun 27
    00:0012:00
    Jun 28
    00:0012:00
    Jun 29
    00:0012:00
    Jun 30
    00:0012:00
    Jul 1
    00:0012:00
    Jul 2
    00:0012:00
    Jul 3
    00:0012:00
    Jul 4
    00:0012:00
    Jul 5
    00:0012:00
    Jul 6
    00:0012:00
    Jul 7
    00:0012:00
    Jul 8
    00:0012:00
    Jul 9
    00:0012:00
    Jul 10
    00:0012:00
    Jul 11
    00:0012:00
    Jul 12
    00:0012:00
    Jul 13
    00:0012:00
    Jul 14
    00:0012:00
    Jul 15
    00:0012:00
    Jul 16
    00:0012:00
    Jul 17
    00:0012:00
    Jul 18
    00:0012:00
    Jul 19
    00:0012:00
    Jul 20
    00:0012:00
    Jul 21
    00:0012:00
    Jul 22
    00:0012:00
    Jul 23
    00:0012:00
    Jul 24
    00:0012:00
    Jul 25
    00:0012:00
    Jul 26
    00:0012:00
    Jul 27
    00:0012:00
    Jul 28
    00:0012:00
    Jul 29
    00:0012:00
    Jul 30
    00:0012:00
    Jul 31
    00:0012:00
    Aug 1
    00:0012:00
    Aug 2
    00:0012:00
    Aug 3
    00:0012:00
    Aug 4
    00:0012:00
    Aug 5
    00:0012:00
    Aug 6
    00:0012:00
    Aug 7
    00:0012:00
    Aug 8
    00:0012:00
    Aug 9
    00:0012:00
    Aug 10
    00:0012:00
    Aug 11
    00:0012:00
    Aug 12
    00:0012:00
    Aug 13
    00:0012:00
    Aug 14
    00:0012:00
    Aug 15
    00:0012:00
    Aug 16
    00:0012:00
    Aug 17
    00:0012:00
    Aug 18
    00:0012:00
    Aug 19
    00:0012:00
    Aug 20
    00:0012:00
    Aug 21
    00:0012:00
    Aug 22
    00:0012:00
    Aug 23
    00:0012:00
    Aug 24
    00:0012:00
    Aug 25
    00:0012:00
    Aug 26
    00:0012:00
    Aug 27
    00:0012:00
    Aug 28
    00:0012:00
    Aug 29
    00:0012:00
    Aug 30
    00:0012:00
    Aug 31
    00:0012:00
    Sep 1
    00:0012:00
    Sep 2
    00:0012:00
    Sep 3
    00:0012:00
    Sep 4
    00:0012:00
    Sep 5
    00:0012:00
    Sep 6
    00:0012:00
    Sep 7
    00:0012:00
    Sep 8
    00:0012:00
    Sep 9
    00:0012:00
    Sep 10
    00:0012:00
    Sep 11
    00:0012:00
    Sep 12
    00:0012:00
    Sep 13
    00:0012:00
    Sep 14
    00:0012:00
    Sep 15
    00:0012:00
    Sep 16
    00:0012:00
    Sep 17
    00:0012:00
    Sep 18
    00:0012:00
    Sep 19
    00:0012:00
    Sep 20
    00:0012:00
    Sep 21
    00:0012:00
    Sep 22
    00:0012:00
    Sep 23
    00:0012:00
    Sep 24
    00:0012:00
    Sep 25
    00:0012:00
    Sep 26
    00:0012:00
    Sep 27
    00:0012:00
    Sep 28
    00:0012:00
    Sep 29
    00:0012:00
    Sep 30
    00:0012:00
    Oct 1
    00:0012:00
    Oct 2
    00:0012:00
    Oct 3
    00:0012:00
    Oct 4
    00:0012:00
    Oct 5
    00:0012:00
    Oct 6
    00:0012:00
    Oct 7
    00:0012:00
    Oct 8
    00:0012:00
    Oct 9
    00:0012:00
    Oct 10
    00:0012:00
    Oct 11
    00:0012:00
    Oct 12
    00:0012:00
    Oct 13
    00:0012:00
    Oct 14
    00:0012:00
    Oct 15
    00:0012:00
    Oct 16
    00:0012:00
    Oct 17
    00:0012:00
    Oct 18
    00:0012:00
    Oct 19
    00:0012:00
    Oct 20
    00:0012:00
    Oct 21
    00:0012:00
    Oct 22
    00:0012:00
    Oct 23
    00:0012:00
    Oct 24
    00:0012:00
    Oct 25
    00:0012:00
    Oct 26
    00:0012:00
    Oct 27
    00:0012:00
    Oct 28
    00:0012:00
    Oct 29
    00:0012:00
    Oct 30
    00:0012:00
    Oct 31
    00:0012:00
    Nov 1
    00:0012:00
    Nov 2
    00:0012:00
    Nov 3
    00:0012:00
    Nov 4
    00:0012:00
    Nov 5
    00:0012:00
    Nov 6
    00:0012:00
    Nov 7
    00:0012:00
    Nov 8
    00:0012:00
    Nov 9
    00:0012:00
    Nov 10
    00:0012:00
    Nov 11
    00:0012:00
    Nov 12
    00:0012:00
    Nov 13
    00:0012:00
    Nov 14
    00:0012:00
    Nov 15
    00:0012:00
    Nov 16
    00:0012:00
    Nov 17
    00:0012:00
    Nov 18
    00:0012:00
    Nov 19
    00:0012:00
    Nov 20
    00:0012:00
    Nov 21
    00:0012:00
    Nov 22
    00:0012:00
    Nov 23
    00:0012:00
    Nov 24
    00:0012:00
    Nov 25
    00:0012:00
    Nov 26
    00:0012:00
    Nov 27
    00:0012:00
    Nov 28
    00:0012:00
    Nov 29
    00:0012:00
    Nov 30
    00:0012:00
    Dec 1
    00:0012:00
    Dec 2
    00:0012:00
    Dec 3
    00:0012:00
    Dec 4
    00:0012:00
    Dec 5
    00:0012:00
    Dec 6
    00:0012:00
    Dec 7
    00:0012:00
    Dec 8
    00:0012:00
    Dec 9
    00:0012:00
    Dec 10
    00:0012:00
    Dec 11
    00:0012:00
    Dec 12
    00:0012:00
    Dec 13
    00:0012:00
    Dec 14
    00:0012:00
    Dec 15
    00:0012:00
    Dec 16
    00:0012:00
    Dec 17
    00:0012:00
    Dec 18
    00:0012:00
    Dec 19
    00:0012:00
    Dec 20
    00:0012:00
    Dec 21
    00:0012:00
    Dec 22
    00:0012:00
    Dec 23
    00:0012:00
    Dec 24
    00:0012:00
    Dec 25
    00:0012:00
    Dec 26
    00:0012:00
    Dec 27
    00:0012:00
    Dec 28
    00:0012:00
    Dec 29
    00:0012:00
    Dec 30
    00:0012:00
    Dec 31
    00:0012:00
    Line stopped: Stops mid-cycle, hydraulic alarm
    Degraded: Pressure drifting, cycle times up
    Degraded: Hydraulic temperature over limit
    Degraded: Pressure drifting, cycle times up
    Degraded: Drive fault cleared on restart
    Degraded: Alarm latched after the hydraulic fault
    Degraded: Drive fault cleared on restart
    Degraded: Drive fault cleared on restart
    Degraded: Clamp slipping on thin stock
    Degraded: Clamp slipping on thin stock
    Degraded: Clamp slipping on thin stock
    Degraded: Clamp slipping on thin stock
    Degraded: Clamp slipping on thin stock
    Degraded: Clamp slipping on thin stock
    Planned stop: Hydraulic service, plan PM-0031-A
    Line stopped: Stops mid-cycle, hydraulic alarm
    Degraded: Pressure drifting, cycle times up
    Degraded: Hydraulic temperature over limit
    Degraded: Pressure drifting, cycle times up
    Planned stop: Hydraulic service, plan PM-0031-A
    Degraded: Drive fault cleared on restart
    Degraded: Alarm latched after the hydraulic fault
    Degraded: Drive fault cleared on restart
    Degraded: Drive fault cleared on restart
    Degraded: Clamp slipping on thin stock
    Degraded: Clamp slipping on thin stock
    Degraded: Clamp slipping on thin stock
    Degraded: Clamp slipping on thin stock
    Degraded: Clamp slipping on thin stock
    Degraded: Clamp slipping on thin stock
    Line stopped: Tool changer jammed on pocket 4
    Degraded: Spindle noise above 12,000 rpm
    Degraded: Spindle noise above 12,000 rpm
    Degraded: Spindle noise above 12,000 rpm
    Degraded: Spindle noise above 12,000 rpm
    Degraded: Spindle noise above 12,000 rpm
    Degraded: Spindle noise above 12,000 rpm
    Degraded: Pocket 4 indexing slowly
    Degraded: Pocket 4 indexing slowly
    Degraded: Pocket 4 indexing slowly
    Degraded: Pocket 4 indexing slowly
    Planned stop: Changer alignment, plan PM-0033-C
    Degraded: Spindle noise above 12,000 rpm
    Degraded: Spindle noise above 12,000 rpm
    Degraded: Spindle noise above 12,000 rpm
    Degraded: Spindle noise above 12,000 rpm
    Degraded: Spindle noise above 12,000 rpm
    Degraded: Spindle noise above 12,000 rpm
    Line stopped: Tool changer jammed on pocket 4
    Degraded: Pocket 4 indexing slowly
    Degraded: Pocket 4 indexing slowly
    Degraded: Pocket 4 indexing slowly
    Degraded: Pocket 4 indexing slowly
    Planned stop: Changer alignment, plan PM-0033-C
    Line stopped: Back gauge lost, panels out of tolerance
    Degraded: Back gauge losing its reference
    Degraded: Back gauge losing its reference
    Degraded: Back gauge losing its reference
    Degraded: Back gauge losing its reference
    Degraded: Back gauge losing its reference
    Degraded: Weeping ram seal, pressure held
    Degraded: Weeping ram seal, pressure held
    Degraded: Weeping ram seal, pressure held
    Degraded: Weeping ram seal, pressure held
    Degraded: Weeping ram seal, pressure held
    Line stopped: Back gauge lost, panels out of tolerance
    Degraded: Back gauge losing its reference
    Degraded: Back gauge losing its reference
    Degraded: Back gauge losing its reference
    Degraded: Back gauge losing its reference
    Degraded: Back gauge losing its reference
    Degraded: Weeping ram seal, pressure held
    Degraded: Weeping ram seal, pressure held
    Degraded: Weeping ram seal, pressure held
    Degraded: Weeping ram seal, pressure held
    Degraded: Weeping ram seal, pressure held
    Degraded: Fume extraction down to half flow
    Degraded: Fume extraction down to half flow
    Degraded: Fume extraction down to half flow
    Degraded: Fume extraction down to half flow
    Degraded: Fume extraction down to half flow
    Degraded: Fume extraction down to half flow
    Planned stop: Lens change, plan PM-0028-B
    Planned stop: Nozzle and calibration, plan PM-0028-B
    Planned stop: Lens change, plan PM-0028-B
    Planned stop: Nozzle and calibration, plan PM-0028-B
    Degraded: Fume extraction down to half flow
    Degraded: Fume extraction down to half flow
    Degraded: Fume extraction down to half flow
    Degraded: Fume extraction down to half flow
    Degraded: Fume extraction down to half flow
    Degraded: Fume extraction down to half flow
    Degraded: Pressure recovering slowly after a peak
    Degraded: Pressure recovering slowly after a peak
    Degraded: Dew point above the set limit
    Degraded: Dew point above the set limit
    Degraded: Dew point above the set limit
    Degraded: Dew point above the set limit
    Degraded: Dew point above the set limit
    Degraded: Dew point above the set limit
    Planned stop: Contractor inspection, off the line
    Degraded: Pressure recovering slowly after a peak
    Degraded: Pressure recovering slowly after a peak
    Planned stop: Contractor inspection, off the line
    Degraded: Dew point above the set limit
    Degraded: Dew point above the set limit
    Degraded: Dew point above the set limit
    Degraded: Dew point above the set limit
    Degraded: Dew point above the set limit
    Degraded: Dew point above the set limit
    • Line stopped
    • Degraded
    • Planned stop

    A machine with no scheduled hours logged reads not measured in the rate column rather than 0%.

    Frame press 2 / Hydraulic circuit

    Stops mid-cycle, hydraulic alarm

    Line stoppedOccurrence 2 of 5
    Selected stop
    3.50 h
    Occurrences
    5
    Down this week
    20.75 h
    Downtime rate
    21.6%

    Activity

    14 Sept – 20 Sept
    00:0006:0012:0018:0023:00
    MonTueWedThuFriSatSun
    One square = one hour
    0 min60 min

    An outlined square is an hour outside the logged operating window: not measured, not zero.

    EQ-0031 Frame press 2
    Hall B · Framing
    Hydraulic circuit
    Tue 15 Sept, 09:41
    Tue 15 Sept, 13:11
    MNT-2026-0061
    MO-2026-0312
    3.50 h
    Thu 17 Sept
    6,470 h run
    6,500 h
    Every 500 h run or 6 months

    Maintenance budget

    Recorded€3,140 of €4,500
    x

    €1,360 uncommitted

    Occurrence history

    Downtime in hours · Hydraulic circuit

    Highlighted bar is the selected occurrence. Use the arrows above to walk this part's stops.

    Frame press 2
    EQ-0031 · Hall B
    PartHydraulic circuit
    StartedTue 15 Sept, 09:41
    EndedTue 15 Sept, 13:11
    Duration3.50 h
    StopLine stopped
    Hydraulic alarm
    MNT-2026-0061
    Open
    Equipment
    EQ-0031 · Frame press 2
    Started
    Tue 15 Sept, 09:41
    Stop
    Line stopped
    Hours to service
    Counter against the plan
    • Frame press 26,470 of 6,500 h
    • CNC router 13,128 of 3,250 h
    • Press brake 14,210 of 4,500 h
    • Laser cutter L-011,842 of 2,000 h
    Hours runUntil serviceOverdue
    Next serviceFrame press 2
    Frame press 2
    Maintenance budget
    Left in the budget
    €1,360
    Recorded
    €3,140
    Left
    €1,360
    Budget
    €4,500
    Maintenance cost
    Atelier Nord
    Within budget
    €7,955Of budget51%
    Recorded to date
    By equipment6 machines
    Frame press 2
    €3,140
    Press brake 1
    €1,520
    Laser cutter L-01
    €1,265
    CNC router 1
    €980
    Compressor C2
    €640
    Van 2-KLM-482
    €410
    Ask the equipment
    Which order did the hydraulic alarm on Frame press 2 delay?
    MO-2026-0312, by 3.5 h. It moved to Thursday 17 September.
    MNT-2026-0061
    Hydraulic alarm · Frame press 2
    MO-2026-0312
    Moved to Thu 17 Sept
    Sources
    Delayed orders
    14 to 20 Sept

    MO-2026-0312

    Frame press 2

    Thu 17 Sept

    MO-2026-0318

    CNC router 1

    Fri 18 Sept

    MO-2026-0321

    Press brake 1

    Mon 21 Sept

    MO-2026-0315

    Laser cutter L-01

    Thu 17 Sept

    Read from the stops. Visible to production. Linked to their work orders.

    Compressor C2
    Annual inspection
    Planned
    52 days
    until 6 November

    Today

    6 Nov 20256 Nov 2026
    Plan by date
    • Pressure drifting, cycle times up

      Mon 14 Sept · 1.75 h · MNT-2026-0059

    • Hydraulic alarm, line stopped

      Tue 15 Sept · 3.50 h · MNT-2026-0061

    • Hydraulic service, plan PM-0031-A

      Fri 18 Sept · 4 h · MNT-2026-0063

    • Pressure drifting again

      Sat 19 Sept · 1 h · MNT-2026-0059

    © 2026 Enobase, Inc. All rights reserved.

    Log in
    All systems normal