• About us
Log inDemo

Enobase Manufacturing

From the bill of materials to the released batch

Every order on the floor, and what holds it back

Production shows each order with its materials, operations and progress. A missing component blocks the right order on screen before it stops the line.

Book a demo

One product, from design change to shipment

Engineering, planning, production and quality read the same product and the same batch, so a change reaches the floor in the version it was approved.

Book a demo

Product Engineering: component checks

Compare component information across the product definition, purchasing and related supporting records.

Product Engineering: version cost changes

The cost comparison shows the effect of a proposed change on unit cost.

Quality: inspection results

Measured values and specifications appear together with the recorded inspection result.

Production Planning: operation sequence

Arrange production steps on a timeline to see dependencies and planned completion dates.

Quality checked where the batch is made

Quality records controls, deviations and decisions on the batch itself. A batch is released or held with the evidence attached, not a separate spreadsheet.

Book a demo

Production teams that stoppedchasing paper travellers

What changes when planning, production and quality share one batch record.

“For each lighting order, the team can see the components and production steps together. If assembly is waiting for a driver, we can identify the shortage before promising a completion date.”

PM
Production manager
Lighting manufacturer

“We record the materials and workshop time on each sign order. I can compare the actual cost with our estimate and understand which jobs need a closer look.”

FM
Finance manager
Sign maker
Built for makers whose products change faster than a generic ERP.
From the drawing to the released batch.
Book a demo
Product EngineeringManage product components, compare versions and review engineering changes.ExploreProduction PlanningPlan production quantities and dates against materials and available capacity.ExploreProductionFollow manufacturing orders, component requirements, progress and actual production costs.Explore

Questions about manufacturing in Enobase

What teams ask before they move their production.

It lists the components and quantities needed to make a product. You can use it to prepare manufacturing requirements and understand the product’s component cost.

See Enobase on your shop floor.

30 minutes, your real products and orders on screen. We'll show you where the plan and the floor drift apart, no slides.

Book a demo

Platform

  • Data Model
  • AI
  • Analytics
  • Integrations
  • Workflows
  • Documents
  • Collaboration
  • Knowledge
  • Security & Access

Modules

  • Platform
  • Site
  • Sales
  • Finance
  • Supply Chain
  • People
  • Marketing
  • Services
  • Discover all modules

Industries

  • Catering
  • Construction Company
  • Private Equity
  • Law Office
  • Real Estate Agency
  • Fitness Center
  • Media Production Studio
  • Recruitment Agency
  • All industries

Resources

  • Updates
  • Changelog
  • Switch to Eno
  • Download
  • Contact

Legal

  • Privacy
  • Terms
  • Subprocessors

Company

  • About us
  • Careers
  • Press & Brand
  • Manifesto
  • Design partners
  • Ambassador program
  • Industry co-founders

Compare

  • Lovable

© 2025 Eno. All rights reserved.

  • LinkedIn
  • X
  • GitHub
  1. Production
  2. /
  3. Order board

Order board

Released3
MO-2026-0151
CR

Stock rule
6 of 8 reserved · 2 short
Saw S1
€0.00
In stage 1d
MO-2026-0153
LF

Quote Q-2026-0442
9 of 9 reserved
Saw S1
€0.00
In stage 2d
MO-2026-0154
NB

Quote Q-2026-0447
4 of 7 reserved · 3 short
Saw S1
€0.00
In stage 3d
Components reserved3
MO-2026-0149
CR

Quote Q-2026-0431
9 of 9 reserved
Bench B1
€1,093.60
In stage 4d
MO-2026-0150
TV

Stock rule
8 of 8 reserved
Bench B1
€1,407.00
In stage 2d
MO-2026-0152
LF

Quote Q-2026-0438
5 of 7 reserved · 2 short
Bench B1
€760.00
In stage 5d
On the bench2
MO-2026-0146
NB

Quote Q-2026-0409
9 of 9 reserved
Bench B2
€1,196.60
In stage 3d
MO-2026-0147
TV

Quote Q-2026-0415
7 of 7 reserved
Bench B2
€495.40
In stage 1d
Finished lot2
MO-2026-0142
CR

Quote Q-2026-0398
9 of 9 reserved
Bench B2
€1,441.20
In stage 6d
MO-2026-0143
LF

Stock rule
8 of 8 reserved
Packing P1
€1,427.40
In stage 4d
MO-2026-0142
LB-600 Light panel × 12
Quote Q-2026-0398, accepted
Maison Verrière
2 Oct 2026
Bench B2
12 pc reserved
24 pc reserved
12 pc reserved
12 set reserved
12 pc reserved
12 pc reserved
24 pc reserved
12 set reserved
12 set reserved
Saw S1 · 58 min of 55 planned
Bench B1 · 96 min of 90 planned
Bench B2 · 128 min of 120 planned
LB-600 rev. B
Insulation test at 500 V
Packing P1 · 24 min of 25 planned
€850.80 · standard €820.20
€590.40 · standard €563.40
€1,441.20 · standard €1,383.60
€120.10 · standard €115.30
LOT-2026-0917
12 units
1 × Diffuser panel · Cracked on handling
Driver 24 V
ART-2104
Changed
v2 · 30 WART-2117€6.40
v3 · 36 WART-2140€7.95
QuoteDelaunay Group€7.95
Difference
+€1.55
Per panel
+€1.55

The only line that differs between v2 and v3.

PartDelaunay Group
v3 unit cost
LED panel 600 × 600
Approved
v3
€37.35
Carried over · 4 components
€29.40
Driver 24 V 36 W · ART-2140
€7.95
ECO-2026-000918 Sept 2026
Seal width
Pouch 250 g · PK-260912
Upper limitTargetLower limitOut of limits
  • 07:00: 5.3
  • 07:30: 5.2
  • 08:00: 5.3
  • 08:15: 5.1
  • 08:30: 4.1 Out of limits
Samples out of limits1 of 5
Bracket assembly
PLAN-2026-0142
9 – 17 Mar
911131517

Receipt, 10 – 12 Mar, Expected

Press, 12 – 14 Mar, Press cell 2

Weld, 14 – 16 Mar, Weld bay

Assembly, 16 Mar, Assembly line 1

9 Mar
20 assemblies4 steps
  1. Quality
  2. /
  3. Quality issues

Quality issues

Reported3
QN-0251
LF

Minor
QN-0252
TV

Minor
QN-0253
NB

Major
Investigating3
QN-0248
CR

Major
QN-0246
TV

Major
QN-0247
LF

Critical
Correcting2
QN-0241
NB

Major
QN-0243
CR

Minor
Verification2
QN-0237
LF

Major
QN-0239
TV

Minor
Closed2
QN-0230
CR

Minor
QN-0232
NB

Minor
Investigating
CRCamille Roux
Major
Pouch 250 g
PK-260912
17 Sept 2026

Comments

  1. Léa Fontaine15 Sept, 07:10

    Held 240 bags from lot PK-260912. Seal width measured 4.1 mm against the 5.0 mm work instruction.
  2. Camille Roux15 Sept, 07:35

    Checking the sealing jaw setup. Keep the lot on hold until the repeat sample is reviewed.

© 2026 Eno. All rights reserved.

Log in
All systems normal