• About us
Log inDemo

Production Planning

Plan what to make, with what you have.

A production schedule grounded in demand and capacity

Production requirements meet available materials, work-centre capacity and deadlines in the same plan. The operation sequence shows when work should happen. Review shortages and overloads before releasing that work to the workshop.

Request a demo

Check what the plan requires

Quantities, incoming components and available hours explain what each plan requires. The operation sequence puts those requirements on a timeline.

Request a demo

Planned quantities

Review the quantities in each production plan and understand how demand is covered.

Incoming materials

Expected receipt dates show when components needed for planned work should arrive.

Work-centre time

Review the operations scheduled on a production line and their expected duration.

Operation sequence

Arrange production steps on a timeline to see dependencies and planned completion dates.

Balance work across production resources

Planned workload and available hours show capacity across work centres. Material and preparation checks indicate whether scheduled work is ready to start.

Request a demo

Capacity by work centre

Planned workload and available hours reveal which production resources are overloaded.

Weekly production plans

Review the week’s production requirements together before confirming what the workshop should make.

Available production time

See how a line’s time is divided between scheduled work and remaining capacity.

Plan adjustments

Compare changes to planned quantities and review their impact before updating production.

Start readiness

Check materials and preparation tasks before releasing the planned work to production.

Production planning that fits your workshop’s constraints.

In a 30-minute demo, review your demand, material needs and available capacity, then see how to bring those constraints into production planning in Eno.

Request a demo

How teams use it

Examples of how this can fit into daily work.

“I can compare the week’s bracket orders with machine hours and component receipts. It makes it much easier to explain which date is realistic and what needs to move.”

PP
Production planner
Metal fabrication workshop

“We plan mixing and packing together rather than checking two separate schedules. The team can see whether the line has enough time for the quantities we need.”

OM
Operations manager
Food producer
Connected information
Keep the details and follow-up work in the same workspace.
Request a demo
Product EngineeringManage product components, compare versions and review engineering changes.ExploreProductionFollow manufacturing orders, component requirements, progress and actual production costs.ExploreQualityRecord inspections and quality issues, then follow corrective actions.Explore

Questions and answers

Planning decides what to make, when and with which resources. Manufacturing follows the execution of those orders, including progress, materials used and actual time.

Production planning that fits your workshop’s constraints.

In a 30-minute demo, review your demand, material needs and available capacity, then see how to bring those constraints into production planning in Eno.

Request a demo

Platform

  • Data Model
  • AI
  • Analytics
  • Integrations
  • Workflows
  • Documents
  • Collaboration
  • Knowledge
  • Security & Access

Modules

  • Platform
  • Site
  • Sales
  • Finance
  • Supply Chain
  • People
  • Marketing
  • Services
  • Discover all modules

Industries

  • Catering
  • Construction Company
  • Private Equity
  • Law Office
  • Real Estate Agency
  • Fitness Center
  • Media Production Studio
  • Recruitment Agency
  • All industries

Resources

  • Updates
  • Changelog
  • Switch to Eno
  • Download
  • Contact

Legal

  • Privacy
  • Terms
  • Subprocessors

Company

  • About us
  • Careers
  • Press & Brand
  • Manifesto
  • Design partners
  • Ambassador program
  • Industry co-founders

Compare

  • Lovable

© 2025 Eno. All rights reserved.

  • LinkedIn
  • X
  • GitHub
  1. Production plans

Production plans

PLAN-2026-0142Bracket assemblyPLAN-2026-0143Sauce base

January 2026

1

T

2

F

3

S

4

S

5

M

6

T

7

W

8

T

9

F

10

S

11

S

12

M

13

T

14

W

15

T

16

F

17

S

18

S

19

M

20

T

21

W

22

T

23

F

24

S

25

S

26

M

27

T

28

W

29

T

30

F

31

S

February 2026

1

S

2

M

3

T

4

W

5

T

6

F

7

S

8

S

9

M

10

T

11

W

12

T

13

F

14

S

15

S

16

M

17

T

18

W

19

T

20

F

21

S

22

S

23

M

24

T

25

W

26

T

27

F

28

S

March 2026

1

S

2

M

3

T

4

W

5

T

6

F

7

S

8

S

9

M

10

T

11

W

12

T

13

F

14

S

15

S

16

M

17

T

18

W

19

T

20

F

21

S

22

S

23

M

24

T

25

W

26

T

27

F

28

S

29

S

30

M

31

T

April 2026

1

W

2

T

3

F

4

S

5

S

6

M

7

T

8

W

9

T

10

F

11

S

12

S

13

M

14

T

15

W

16

T

17

F

18

S

19

S

20

M

21

T

22

W

23

T

24

F

25

S

26

S

27

M

28

T

29

W

30

T

May 2026

1

F

2

S

3

S

4

M

5

T

6

W

7

T

8

F

9

S

10

S

11

M

12

T

13

W

14

T

15

F

16

S

17

S

18

M

19

T

20

W

21

T

22

F

23

S

24

S

25

M

26

T

27

W

28

T

29

F

30

S

31

S

June 2026

1

M

2

T

3

W

4

T

5

F

6

S

7

S

8

M

9

T

10

W

11

T

12

F

13

S

14

S

15

M

16

T

17

W

18

T

19

F

20

S

21

S

22

M

23

T

24

W

25

T

26

F

27

S

28

S

29

M

30

T

July 2026

1

W

2

T

3

F

4

S

5

S

6

M

7

T

8

W

9

T

10

F

11

S

12

S

13

M

14

T

15

W

16

T

17

F

18

S

19

S

20

M

21

T

22

W

23

T

24

F

25

S

26

S

27

M

28

T

29

W

30

T

31

F

August 2026

1

S

2

S

3

M

4

T

5

W

6

T

7

F

8

S

9

S

10

M

11

T

12

W

13

T

14

F

15

S

16

S

17

M

18

T

19

W

20

T

21

F

22

S

23

S

24

M

25

T

26

W

27

T

28

F

29

S

30

S

31

M

September 2026

1

T

2

W

3

T

4

F

5

S

6

S

7

M

8

T

9

W

10

T

11

F

12

S

13

S

14

M

15

T

16

W

17

T

18

F

19

S

20

S

21

M

22

T

23

W

24

T

25

F

26

S

27

S

28

M

29

T

30

W

October 2026

1

T

2

F

3

S

4

S

5

M

6

T

7

W

8

T

9

F

10

S

11

S

12

M

13

T

14

W

15

T

16

F

17

S

18

S

19

M

20

T

21

W

22

T

23

F

24

S

25

S

26

M

27

T

28

W

29

T

30

F

31

S

November 2026

1

S

2

M

3

T

4

W

5

T

6

F

7

S

8

S

9

M

10

T

11

W

12

T

13

F

14

S

15

S

16

M

17

T

18

W

19

T

20

F

21

S

22

S

23

M

24

T

25

W

26

T

27

F

28

S

29

S

30

M

December 2026

1

T

2

W

3

T

4

F

5

S

6

S

7

M

8

T

9

W

10

T

11

F

12

S

13

S

14

M

15

T

16

W

17

T

18

F

19

S

20

S

21

M

22

T

23

W

24

T

25

F

26

S

27

S

28

M

29

T

30

W

31

T

Bracket receipt· Expected
Press and form· Press cell 2
Weld subassembly· Weld bay
Assembly· Assembly line 1
Mixing· Mixing line A
Fill and pack· Filling line
QA hold and release· QA lab
Receipt due

PLAN-2026-0143 · Wed 11 Mar

6 AM
7 AM
8 AM
9 AM
10 AM
11 AM
12 PM
1 PM
Batch 1 · sauce base6:00am – 8:00am · 2h
Cleaning window · 45m
Batch 2 · sauce base8:45am – 10:45am · 2h
Cleaning window · 45m
Batch 3 · sauce base11:30am – 1:30pm · 2h

3 batches, 2 cleaning windows

7h 30m booked + 30m unallocated = 8h shift

PLAN-2026-0142
40 · 20 × 2
32
8 · PO-4471
Tue 10 Mar
40 · 32 + 8
Bracket 40 mm
PLAN-2026-0142
8 short
40On hand32
Brackets required
Cover20 × 2
On hand
32
Due on PO-4471
8
Receive PO-4471
8 × Bracket 40 mm
Expected
Supplier
Verbeke Metaal
Due
Tue 10 Mar
Plan
PLAN-2026-0142
Mixing line A
Wed 11 Mar
8 h shift
7 h 30Booked
Batch 1 · sauce base06:00 – 08:00
2 h
Cleaning window08:00 – 08:45
45 min
Batch 2 · sauce base08:45 – 10:45
2 h
Cleaning window10:45 – 11:30
45 min
Batch 3 · sauce base11:30 – 13:30
2 h
Unallocated30 min free
Bracket assembly
PLAN-2026-0142
9 – 17 Mar
911131517

Receipt, 10 – 12 Mar, Expected

Press, 12 – 14 Mar, Press cell 2

Weld, 14 – 16 Mar, Weld bay

Assembly, 16 Mar, Assembly line 1

9 Mar
20 assemblies4 steps
Work centres
9 – 16 Mar, both plans
  • Press cell 22 / 8
  • Weld bay2 / 8
  • Filling line2 / 8
  • Mixing line A1 / 8
BookedFreeOver
Work centres6
Plans this week
Week of 9 March
9 – 16 Mar
Bracket assemblyWaits on PO-4471
x
20
x
20
Sauce baseBooked
x
3
x
3
To makeBooked
PLAN-2026-0142 · PLAN-2026-01432 plans
Mixing line A
Wed 11 Mar, 06:00 – 14:00
Bracket 40 mm
PLAN-2026-0142
Covered
Required
40
Available
32
Expected on PO-4471
8
PO-44717 Sep 2026
Ready to start
Week of 9 March
Plan and operation
Operations ready1/3
x

Bracket assembly

ready: 0/2
  • Press and form

    12 Mar

  • Weld subassembly

    14 Mar

Sauce base

ready: 1/1
  • Mixing

    11 Mar

© 2026 Eno. All rights reserved.

Log in
All systems normal